Inflatable hangars for hospital surge capacity, triage, isolation and medical support facilities — designed and manufactured by us and installed in 1–7 days on a prepared site in the UAE and Saudi Arabia.
An inflatable hangar for a hospital is a large-span pneumatic building that gives a hospital, a civil-defence authority or an aid organisation extra covered floor area — quickly, without foundations and without internal columns. Air beams carry the load and a reinforced PVC membrane encloses the space. Inside, the layout is yours: triage lanes, isolation wards, treatment bays, staff rest areas, PPE and equipment stores, or decontamination areas.
The shell is the part we design and manufacture. Clinical partitions, medical gases, HVAC and filtration, power and equipment are specified with the operator’s medical planner and installed by qualified partners — and the facility is approved for clinical use by the health authority, not by the building supplier.
Installation takes 1–7 days depending on the area. The structure is manufactured at our factory to your specification and shipped ready to erect.
Spans of 10–100 m without columns, with any number of doors, gates, windows and technical openings on any side of the building.
The hall can be dismantled and installed at a new site, so the same investment serves the next emergency, camp or campaign.
The envelope insulates well, so condensation inside is avoided, and the white membrane reflects heat and ultraviolet radiation.
Add covered space next to an existing hospital for triage, screening and overflow wards during demand peaks.
A relocatable base for emergency medical response when permanent capacity is damaged, overloaded or far away.
Large, enclosed halls for field hospitals and clinics operated by aid organisations.
On-site clinics and medical points for oil, gas and construction camps where the nearest hospital is hours away.
High-throughput halls with one-way patient flow for testing and vaccination.
Staff rest and changing areas, PPE and equipment stores, and decontamination areas next to the clinical zone.
| Zone | Typical use | Fit-out |
|---|---|---|
| Triage and screening | Reception, registration, first assessment, sample collection | Light partitions, queue management, power and data |
| Isolation and wards | Isolation rooms, overflow wards, observation areas | Dedicated air handling and filtration inside each isolation room |
| Treatment bays | Treatment, minor procedures, diagnostics | Medical gases, power, lighting, equipment mounting |
| Staff rest and changing | Rest rooms, changing rooms, dining areas | Cooling, sanitary connections, furniture |
| PPE and equipment storage | Warehouse zone for protective equipment and medical supplies | Racking, climate control as required |
| Decontamination | Wash-down and decontamination areas for people and equipment | Water supply, drainage, waste handling |
| Pneumatic hangar | Small inflatable or frame medical tents | |
|---|---|---|
| Scale | One hall from 100 m² with a clear span of 10–100 m | Units of tens of square metres, linked together to form a facility |
| Interior | Open space that can be partitioned freely | Many connected cells, fixed unit dimensions |
| Service life | 15+ years, built for long-term operation | Usually designed for short deployments — check each manufacturer’s data |
| Deployment | 1–7 days per hall | Minutes to hours per unit — faster for the first response |
| Best for | Facilities that must run for months or years at scale | The first hours and days of an emergency |
Many projects use both: tents for the first response, a pneumatic hall once the facility has to stay.
| Pneumatic hospital hall | Container or modular field hospital | |
|---|---|---|
| Installation | 1–7 days for the structure | Typically weeks for a modular facility |
| Interior flexibility | Open clear span, layout set by partitions | Layout set by module dimensions |
| Relocation | Dismantle, pack and reinstall | Crane lifts and heavy transport of modules |
| Ground preparation | Level site with anchoring, no foundations or columns | Level, load-bearing pad for modules |
| Medical fit-out | Shell first, fit-out by partners on site | Often delivered pre-fitted — an advantage for fully equipped units |
If you need a fully equipped unit delivered ready to operate, a containerised hospital can be the better choice. If you need large, flexible floor area quickly, an inflatable hall is.
| Who | Responsible for |
|---|---|
| We supply | The pneumatic shell, doors, windows and technical openings, anchoring, and installation supervision |
| Operator and partners | Clinical partitions, medical gases, HVAC and filtration, power and backup power, equipment, and clinical staffing |
| Health authority | Approval of the facility for clinical use and the infection-control classification of each area |
Only the air beams are pressurised — not the interior. The hall therefore does not create positive or negative room pressure by itself. Isolation rooms are built inside the hall with their own air handling.
You share the purpose, capacity, floor plan and site conditions.
We design the structure and coordinate zones and services with your medical planner.
The hall is made at our factory to your specification.
Delivery to site and installation in 1–7 days.
Partners complete the clinical fit-out; the operator takes the facility through the authority’s approval.
Structure price. The final cost depends on size, openings, anchoring and options. Fill in the questionnaire and we send a cost proposal within 2 hours.
Yes, as the building. The hangar provides a large, weather-protected, partitionable space; the clinical fit-out is added inside it and the facility is approved for clinical use by the health authority. We supply the structure and coordinate with your medical planner.
This page covers inflatable halls that serve as hospitals, field hospitals and medical support facilities. If you need a hangar for an air-ambulance helicopter on a hospital site, see our helicopter hangar page.
Yes, as rooms built inside the hall. Because the hall interior is not pressurised, isolation rooms and operating theatres need their own air handling, filtration and finishes, specified by your medical planner.
Installation of the structure takes 1–7 days depending on the area. Manufacturing time depends on the project, and clinical fit-out follows installation.
The white membrane reflects heat and UV, and the structure is designed for −60…+70 °C. Cooling and air filtration are engineered for each project so the interior stays suitable for clinical use.
Tents are fastest for the first response but are small units. Container hospitals arrive pre-fitted but have fixed module sizes. An inflatable hangar gives one large, open, relocatable hall at scale. We supply the structure, not medical equipment.