No Foundation, Fully Relocatable
Installs directly on a prepared base and can be disassembled and redeployed to a new site or platform - unlike fixed steel shelters.
Helicopter hangar solutions from the manufacturer
Protect and relocate your helicopter fleet with a turnkey inflatable hangar built for rapid deployment - no fixed foundation, no long construction timeline. Designed for offshore platforms, remote sites, emergency response and VIP operations across the UAE and Saudi Arabia.
Relocatable fleet protection
A structure that moves with your fleet - to a new platform, a new base, or a temporary site.
Installs directly on a prepared base and can be disassembled and redeployed to a new site or platform - unlike fixed steel shelters.
UV-stabilized, heat-resistant reinforced PVC membrane rated for extreme temperatures, strong winds and sand/dust exposure.
From single-helicopter shelters to multi-aircraft hangars - engineered to order for your fleet and site conditions.
Every hangar is engineered to order based on your helicopter model and site conditions.
| Usable area | 100–2,500 m² * |
| Internal span | 10–40 m * |
| Internal height | 7–12 m * |
| Operating temperature | −60°C to +70°C |
| Wind resistance | Up to 45 m/s |
| Installation time | 1–7 days, no foundation required |
| Service life | Minimum 15 years |
| Material | Reinforced PVC membrane |
| Criterion | Relocatable Inflatable Hangar | Fixed Steel / Modular Shelter |
|---|---|---|
| Installation time | 1–7 days, no foundation required | Weeks to months, foundation required |
| Mobility | Can be disassembled and redeployed to a new site or platform | Fixed structure, tied to one location |
| Best suited for | Offshore platforms, remote/temporary sites, emergency response | Long-term, single-location bases |
| Climate performance | UV/heat-resistant membrane, rated to +70°C | Requires added insulation/cooling for extreme heat |
From offshore platforms to remote and temporary sites, our inflatable hangars are engineered to protect helicopter fleets where fixed infrastructure isn't practical. Rated for continuous operation from −60°C to +70°C and wind loads up to 45 m/s, with UV- and sand-resistant membrane construction - built for the offshore and onshore conditions of the Gulf. Every hangar is engineered to meet international aviation infrastructure requirements, with compliance support for GCAA (UAE) and GACA (Saudi Arabia) civil aviation standards.
| Task | Frequency |
|---|---|
| Visual inspection | Twice monthly |
| Cable / strap tensioning | Twice monthly |
| Grille cleaning | Monthly |
| Hangar washing | 2–3 times annually |
| Snow removal | When exceeding 100 mm |
Year-round operation: structure performance shown for both summer (+25°C) and winter (−15°C) conditions.
Next step
Get an itemized quote directly from the manufacturer — no distributor markup.
Request a Quote