Clear-span interior
Spans of 10–100 m leave no columns in the sightlines or on the stage.
An inflatable concert hall is a pneumatic structure: load-bearing air-inflated beams carry a reinforced PVC membrane, creating a column-free hall that can be installed, taken down and moved to a new site.
An inflatable concert hall is a pneumatic structure: load-bearing air-inflated beams carry a reinforced PVC membrane, creating a column-free hall that can be installed, taken down and moved to a new site.
Searches for “hangar for concert hall” usually lead to old aircraft hangars converted into venues. This is the alternative: a new, purpose-built hall from the manufacturer, sized for the stage, the audience and the Gulf climate, without converting or building a permanent building.
Spans of 10–100 m leave no columns in the sightlines or on the stage.
Installation takes 1–7 days, so a venue can be ready for a season or a single event.
The hall can be packed, transported and reinstalled for the next event or site.
| Inflatable hall (new) | Converted hangar or warehouse | |
|---|---|---|
| Starting point | A level site and a project brief | An existing building with suitable size and access |
| Interior | Column-free span of 10–100 m | Depends on the existing structure and columns |
| Acoustics and climate | Designed into the project from the start | Large reflective volumes usually need a substantial acoustic and cooling retrofit |
| Location | Any site with level ground and power | Fixed to the building |
| Time to ready | Installation in 1–7 days | Depends on the scope of conversion and approvals |
| Reuse | Can be dismantled and moved to the next venue | Stays where it is |
| Best when | You need a new venue, a seasonal venue or several sites | You already own a suitable building |
| Pneumatic-beam hall (ours) | Air-supported dome | Frame tent | |
|---|---|---|---|
| What holds it up | Load-bearing inflated beams under a PVC membrane | Whole interior kept under slight overpressure by blowers | Aluminium or steel frame with fabric cover |
| Entrances | Door blocks and pneumatic gates in the end walls | Usually airlocks or revolving doors to keep pressure | Standard doors and panels |
| Installation | 1–7 days | Fast, but requires continuous blower operation | Frame assembly; time grows with span |
| Span | 10–100 m | Wide spans possible | Depends on the frame system |
| Best when | You want a durable, reusable hall with a column-free interior | Very large sports and event volumes | Short, low-cost events and rentals |
| Buy from the manufacturer | Hire from an event contractor | |
|---|---|---|
| Cost model | One purchase, reused across events and seasons | Fee for every event or season |
| Availability in peak season | Yours to schedule | Subject to the contractor’s calendar |
| Fit-out and branding | Specified for your own programme | Limited to what the contractor offers |
| Best when | You run several events a year or operate a venue | You need a one-off event |
Leasing options are available.
A membrane hall is not an acoustic space on its own. Absorbers and interior lining are designed for the show type (amplified music, speech or orchestra) together with an acoustic specialist.
Noise reaching the neighbourhood depends on the membrane build-up and on the permit conditions of the site. Limits are checked with the local authority before the design is fixed.
Lighting, PA and stage trusses are carried by an independent ground-supported rig inside the hall rather than hung from the membrane, unless engineering approves specific points.
Mains power, backup generation and audience cooling are specified project by project.
Each air beam is shaped as half a torus and is filled automatically by an intelligent inflation system. The end walls carry door blocks, pneumatic gates and openings for supply and exhaust ventilation.
In the central part the beams are connected by lines through which air is distributed among them. This prevents deformation caused by uneven heating during operation.
Seasonal concert halls and multi-stage festivals, reused between events.
A live-music venue on site without a permanent building.
Column-free halls for stands, stages and visitor flow.
Product launches, gala dinners and roadshows.
National-day celebrations and cultural-season events that need a fast build.
A hall that moves from city to city with the programme.
Show type, audience, site and dates.
We size the structure and provide technical documentation for the permits.
The hall is manufactured to your configuration.
Installation takes 1–7 days on site.
Acoustics, stage, power and cooling are installed and tested.
| Maintenance work | Frequency |
|---|---|
| Visual inspection of load-bearing air beams, pneumatic doors, end walls and the membrane | At least twice a month |
| Tensioning straps and cables that secure the membrane | At least twice a month |
| Cleaning foreign objects from the protective grilles of fan units | Once a month |
| Checking the intelligent inflation system | Once a month |
| Periodic washing of the hall | Two or three times a year |
Record completed work in the service card of the operation manual.
Yes, with the right design. A membrane hall needs interior acoustic treatment and a noise plan for the site, which are specified together with an acoustic specialist for each show type.
Cooling is a separate system specified for the project and the expected audience. Options are defined at the brief stage.
It depends on the layout and the local fire-code occupancy rules. Share your show format and we will propose a configuration from about 200 m² to 10,000 m².
Installation on site takes 1–7 days, depending on size and configuration.
We manufacture and install new pneumatic halls. Converting an existing hangar or building is a different project; we can compare both options for your site. For a general-purpose dome or sports volume, see our inflatable air domes.
Tell us the show, the site and the date. We will size the structure and send you an offer within 2 hours.
Get a quote