In November 2022, a pneumatic hangar was installed on the territory of the Mayak nickel mine to shelter the crushing and screening complex. The structure was assembled element by element and transferred<br />
to the desired location using a crane with a lifting capacity of 250 tons. The useful area of this shelter is 1700 square meters. The pneumatic hangar is equipped with lighting, ventilation and heating systems.