Prefabricated warehouse for storing equipment MT Russia

Prefabricated warehouse for storing equipment MT Russia

In December 2020, a prefabricated warehouse for storing equipment was installed at the construction site of the Amur Gas Processing Plant. The manufacture, delivery and installation of the hangar was carried out in record time. The customer received the finished object in just 1.5 months. The pneumatic hangar is equipped with cargo doors measuring 9x9m, heating, ventilation and lighting systems. The new warehouse made it possible to organize the storage of equipment at the construction site for the needs of MT Russia LLC (a subsidiary of Maire Tecnimont Group)

Fast installation
(12 to 72 hours)
No capital
foundation required
High mobility
and easy relocation
Easy dismantling
and relocation