Installation of an inflatable hangar at the Solovyovsky mine
06.03.2013 0 min 2031
Article author: Miron Bazhanov, Commercial Director
A prefabricated hangar for repair and maintenance of quarry equipment of the Priisk Solovyovsky company. The pneumatic hangar is equipped with pneumatic gates that open outward. The useful area of the inflatable building is 142 sq.m.
Fast installation (12 to 72 hours)
No capital foundation required
High mobility and easy relocation
Easy dismantling and relocation
Need a consultation?
Our manager will contact you to clarify all details.