Installation of an inflatable hangar at the Solovyovsky mine

Installation of an inflatable hangar at the Solovyovsky mine

A prefabricated hangar for repair and maintenance of quarry equipment of the Priisk Solovyovsky company. The pneumatic hangar is equipped with pneumatic gates that open outward. The useful area of the inflatable building is 142 sq.m.

Fast installation
(12 to 72 hours)
No capital
foundation required
High mobility
and easy relocation
Easy dismantling
and relocation
Need a consultation?
Our manager will contact you to clarify all details.
Sending...
Previous article

Do you need a prefabricated structure?
Consult us!

×