The installation of the prefabricated building MPA 15-9-355 has been completed
15.03.2022 0 min 2328
Article author: Miron Bazhanov, Commercial Director
The installation of the prefabricated building MPA 15-9-355 for servicing drilling rig 520 has been completed.
The hangar is designed for work on flaw detection of drilling equipment at a field in the Komi Republic.
Fast installation (12 to 72 hours)
No capital foundation required
High mobility and easy relocation
Easy dismantling and relocation
Need a consultation?
Our manager will contact you to clarify all details.