Hangar construction begins long before installation. Experience shows that site preparation determines the service life and stability of the building, as well as future operating costs. Mistakes at this stage can cause frame misalignment, foundation cracks, site flooding, and expensive repairs. It is therefore much more cost-effective to do the work correctly from the outset than to remedy the consequences months or years after commissioning.
Before construction begins, the suitability of the site must be assessed.
Main site-selection criteria:
Geological surveys are particularly important for large warehouses, production facilities, and buildings with an area of more than 300-500 sq m.
A survey determines:
A simplified assessment is sometimes used for small hangars. Even then, test drilling and evaluation of soil characteristics are recommended.
The prepared site should extend at least 2-5 metres beyond the hangar perimeter. This space is required for installation, access roads, and building maintenance.
The site must be levelled and the following removed:
Elevation differences should preferably be eliminated before foundation work begins.
Drainage beneath a hangar is often underestimated, although water is one of the main causes of foundation damage.
The following should be provided:
A standard hangar base includes:
Proper compaction prevents uneven settlement after construction.
| Storage system | Price per sq m | Mobility | Maximum load | Payback period, months |
| Mobile racks | 15-25 USD | High | 300-500 kg | 12-18 |
| Cantilever racks | 12-20 USD | Medium | 800-1,000 kg | 10-14 |
| Vertical carousels | 35-45 USD | Medium | 200 kg | 15-20 |
When selecting a foundation, the building weight, soil conditions, and regional climate must be considered.
A common situation is construction on fill soil without a survey.
Consequences:
The correct solution is to conduct geological surveys before design.
Contractors sometimes save time by reducing the number of roller passes.
Consequences:
Each layer should be compacted with density control.
Even a strong hangar foundation will not withstand constant exposure to water.
For example, after spring snowmelt the site may flood, allowing water to penetrate beneath the base and gradually damage the structure.
The solution is to include a drainage system at the design stage.
Some customers consider only the dimensions of the future building.
As a result:
Additional site area must be allowed for in advance.
The phrase it will stand anyway causes numerous problems every year.
Consequences:
The foundation type must be determined by calculations, not by a desire to reduce the budget.
Sites where water naturally accumulates require additional preparation.
Without filling and terracing, the following can occur:
Hangar construction errors are often associated with missing approvals and failure to comply with regulations.
Consequences may include fines, a ban on operation, and the need to rebuild the facility.
To prepare a site for a metal hangar, follow this procedure:
A foundation is mandatory for most permanent structures. Certain temporary structures on screw piles are an exception.
Yes. Even sand does not guarantee complete water removal during heavy rainfall.
On average, from one to four weeks, depending on the facility area and soil complexity.
Small savings on geological surveys may lead to much higher costs to remedy the consequences of mistakes.
Proper hangar site preparation directly affects the reliability, safety, and service life of the future building. Thorough geological surveys, a correctly constructed hangar base, effective drainage, and a properly selected foundation prevent most problems before installation begins. If you are planning to build a hangar, it is best to involve specialists during site preparation. This will reduce risks, optimise the budget, and ensure a durable result. Request a consultation and cost estimate to determine the best solution for your facility.